{"id":10605,"date":"2017-11-14T08:19:00","date_gmt":"2017-11-14T08:19:00","guid":{"rendered":"https:\/\/stagingweb.heliospv.net\/?p=10605"},"modified":"2026-02-20T08:21:54","modified_gmt":"2026-02-20T08:21:54","slug":"solar-power-systems-presented-to-sungai-sekeroh-longhouses","status":"publish","type":"post","link":"https:\/\/www.heliospv.net\/my\/solar-power-systems-presented-to-sungai-sekeroh-longhouses\/","title":{"rendered":"Solar power systems presented to Sungai Sekeroh longhouses"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-large-font-size\"><strong><strong>Sarawak Alternative Rural Elecctification Scheme (SARES) solar power projects were handed over to four longhouses in Sungai Sekeroh, Bukit Mabong District.<\/strong><\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"742\" height=\"403\" src=\"http:\/\/stagingweb.heliospv.net\/wp-content\/uploads\/2026\/02\/sares2.png\" alt=\"\" class=\"wp-image-10606\" style=\"width:840px;height:auto\" srcset=\"https:\/\/www.heliospv.net\/my\/wp-content\/uploads\/2026\/02\/sares2.png 742w, https:\/\/www.heliospv.net\/my\/wp-content\/uploads\/2026\/02\/sares2-300x163.png 300w, https:\/\/www.heliospv.net\/my\/wp-content\/uploads\/2026\/02\/sares2-550x299.png 550w\" sizes=\"(max-width: 742px) 100vw, 742px\" \/><\/figure>\n\n\n\n<p>KAPIT: Sarawak Alternative Rural Electrification Scheme (Sares) solar power projects were handed over to four longhouses in Sungai Sekeroh, Bukit Mabong District on Tuesday.<\/p>\n\n\n\n<p>Nicholas Kudi Jantai \u2013 a political secretary to the Chief Minister \u2013 handed over the projects to Rumah Jana, Nanga Gelong Kanan; Rumah Linggi, Nanga Jelayan; Rumah Alan, Nanga Gelong Kiba; and Rumah Serani, Sungai Sekeroh.<\/p>\n\n\n\n<p>The projects costing RM3.5 million have benefited a total of 56 \u2018bilik\u2019 with 499 residents.<\/p>\n\n\n\n<p>Kudi also handed over signed pledges by the headmen regarding the maintenance of the Sares systems.<\/p>\n\n\n\n<p>Under the National Blue Ocean Strategy partnership, the projects are financed equally between the state government and the Ministry of Rural and Regional Development.<\/p>\n\n\n\n<p>Sares is used for areas considered too remote to be connected to the power grid for round-the-clock electricity supply.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sarawak Alternative Rural Elecctification Scheme (SARES) solar power projects were handed over to four longhouses in Sungai Sekeroh, Bukit Mabong District. KAPIT: Sarawak Alternative Rural Electrification Scheme (Sares) solar power projects were handed over to four longhouses in Sungai Sekeroh, Bukit Mabong District on Tuesday. Nicholas Kudi Jantai \u2013 a political secretary to the Chief Minister \u2013 handed over the projects to Rumah Jana, Nanga&#8230; <\/p>\n<p class=\"more\"><a class=\"more-link\" href=\"https:\/\/www.heliospv.net\/my\/solar-power-systems-presented-to-sungai-sekeroh-longhouses\/\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":10606,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-10605","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","is-cat-link-borders-light is-cat-link-rounded"],"_links":{"self":[{"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/posts\/10605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/comments?post=10605"}],"version-history":[{"count":1,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/posts\/10605\/revisions"}],"predecessor-version":[{"id":10607,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/posts\/10605\/revisions\/10607"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/media\/10606"}],"wp:attachment":[{"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/media?parent=10605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/categories?post=10605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.heliospv.net\/my\/wp-json\/wp\/v2\/tags?post=10605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}